Inspection of the Work Paseo de Bajo - Section C, North Semi-Covered Trench.
The inspection covered the construction works of viaducts, semi-covered trenches, containment enclosures and the land gained from the River Plate. The main objective of the Paseo del Bajo project was to improve road connectivity and mobility in the City of Buenos Aires, making access to the Port of Buenos Aires easier and reducing heavy traffic in urban areas.
Supervision of the Opening and Maintenance Works of National Route No. 9 and Accesses.
The goal of the work is to improve transit capacity and service level of the National Route No. 9 of Paraguay, from kilometer 50 to kilometer 525, including access to nearby localities. The inspected works included the addition of 400 km to the existing route (extension was doubled), rehabilitation of 75 km and construction of accesses.
Supervision of the Catenary Laying Work on Tracks and Energy Distribution Lines (LDS) and Power Lines (LDF) New Quilmes Transformer Substation, Auto-transformation Posts and Remote Control Systems Constitución-La Plata Branch. Buenos Aires.
This supervision covered the works for installation of railway catenary power lines, construction of electrical substations and remote control systems for the electrification and signaling of the passenger railway service on the Plaza Constitución-La Plata branch, with the aim of reducing travel time, improving service reliability and increasing its share in the Buenos Aires-La Plata Corridor.