Technical and Socio-Environmental Screening of the Works to Expand the Salado River Capacity (Section IV-1-B). Channeling, widening and deepening of the second sector of Section 4 of the Salado River channel to enable runoff of the largest flows from incoming basins.
The main objective of the project was to improve the course of Salado River in the second sector of Section 4, allowing the planned flow to runoff efficiently. The channeling, widening and deepening works of the river were inspected, in accordance with the technical studies previously carried out, to ensure adequate evacuation capacity, especially when flows are higher.
Inspection of the Work: Boulevard 9 de Julio Storm Drain, City of Yerba Buena, Dept of Yerba Buena. Social-Environmental Screening.
The execution of a storm drain relief conduit was inspected, including the adaptation of the existing ditch and the construction of a main underground collector and secondary collectors to improve drainage capacity and prevent flooding in the area, ensuring the works quality and compliance with environmental standards.
Inspection of the Work: Drainage System in the Manantiales Area of the Recovery and Development of the Irrigation Area – Province of Jujuy.
The project involved the inspection and improvement of 80 existing canals, consisting of 255 sections, along with the construction of 31 new canal sections and 47 drains. The objective is to implement an integrated drainage system to evacuate excess rainfall and irrigation, ensuring adequate water management in the area.